The video below shows the process of running CML Compiler to generate a CML. It also shows running quality assurance tests on the generated CML in INTERCONNECT.
It captures the following:
- Launch CML Compiler
- Run CML Compiler
- Building Library
- Data validation passed
- Test scripts generated
- Compiled CML available
- Launch INTERCONNECT for Quality Assurance (QA) testing
- Open QA for Electrical Phase Shifter
- Running QA
- Test VpiLpi
- Test electrical bandwidth
- Test Monte Carlo statistical distribution